got / For manufacturing
For manufacturing
The ERP runs the plant. Spreadsheets run everything around it.
Production data is typed again into payroll. Quality records live in one person's workbook. Planning is a spreadsheet only two people understand, and one of them retires in three years. We measure what that costs each week, fix it in order of payoff, and leave the people involved with better jobs.
Four problems we are set up for.
Re-keying between systems
Timesheets into payroll, orders into the ERP, ERP figures into a monthly report. We sit with the people who do it for a normal week, time every step, and give you the cost in hours and in errors before proposing anything.
Knowledge held by one person
The scheduler, the payroll clerk, the quality lead with the master workbook. We document what they do, build it into the system where that is worth it, and design the role that remains so it is still a job worth having.
Grades for office and shop floor
Equal pay law compares jobs on skills, effort, responsibility and working conditions. That means heat, noise, shifts and physical effort count, and so do the demands of office roles. We build one structure that treats both fairly and can be explained on the floor.
New systems nobody uses
A module was bought, training was given, and the spreadsheet is still open on every screen. People use what helps them do the job (Davis, 1989). We find out what the system fails to do for them, and fix that.
The work and systems map
A fixed-price first project on one process, such as order to invoice, clock-in to payslip, or non-conformance to corrective action.
What you get
- A one-page map of the process as it is really done, with every system, spreadsheet and hand-off.
- A table of manual steps: who does each, how often, how long it takes, and what goes wrong. Measured over a normal week, across both shifts.
- A plan to keep, connect, replace or retire, in order of payoff. Each line shows the cost, the hours it frees a week, and how long before it pays for itself.
- A technical note for your IT lead or ERP partner: interfaces available, data fields, risks, and what needs their sign-off.
- Up to two fixes that each take us under a day, built, documented and handed over, on your change calendar. Work your ERP partner must do on their side is quoted by them and is not in our price.
What a map looks for
We cannot tell you what yours will find. These are the things it checks for in a plant: hours keyed once at the clock and again into payroll; overtime approved on paper and re-entered; non-conformances logged in two places that never agree; stock adjusted in a spreadsheet the ERP does not see; one person's workbook that month-end depends on.
A worked example of the arithmetic
These numbers are an illustration, not a result from a client. Suppose two clerks each spend six hours a week copying clock-in data into payroll and correcting it. That is 12 hours a week, about 600 hours a year. At a loaded cost of €15 an hour, that is €9,000 of paid time a year, before counting payslip errors. Suppose a direct export costs €3,000 to build, including your ERP partner's time. With the €3,400 map, the total is €6,400.
The saving is time, not jobs. If the freed hours replace overtime or agency cover, that is €9,000 a year in cash and the €6,400 comes back in about nine months. If they go to other work, such as chasing absence or checking overtime before it is paid, the return is that work, and the plan says which. Your plan shows cash savings and redeployed time as separate figures. The map exists to replace the word "suppose" with your own measured figures.
What we need
- Access to the people who do the work, 45 minutes each, in working time and with their supervisor's agreement.
- Read access to the systems in scope, or screen-sharing with someone who has it.
- About eight hours of an operations or finance lead's time over three weeks.
How we work in a plant
- On site, on shift. We come to the floor, including early and late shifts, in the PPE you require. We do not ask operators to come to a meeting room.
- In Maltese or English. People explain their work best in their own language.
- With the union from the first meeting. Collective agreements are common in larger plants. Changes to roles or grades are planned with the shop steward, and nothing in our work is designed to cut headcount by the back door. If a role shrinks, we say so openly and help redesign it.
- Nothing behind the union's back. The shop steward is told before any payroll extract leaves the company, and what leaves is pseudonymised: employee numbers, not names.
- A fallback for every build. Being there at go-live is part of the project; what we do not offer is on-call cover afterwards. So each build keeps its manual route working for one full payroll cycle and at least one month-end after go-live, and the runbook tells your IT person how to switch back.
- With your ERP partner, not against them. We use the interfaces your system already has. Anything that touches the ERP is agreed with whoever supports it.
- No production risk. We do not connect to machines or control systems. Our work stays on the business systems side. On a two-shift plant, changes go live at a weekend or shift change, we are there when they do, and each has a written step to switch it back.
Pay transparency at your size
- Under 100 staff: everything except the pay gap report applies now, with lighter rules on written progression criteria below 50 staff.
- 100 to 149 staff: the same, plus a first report by 7 June 2031 on calendar year 2030. The joint pay assessment only arises once you report.
- 150 or more: first report by 7 June 2027 on calendar year 2026. If you are close to 150, do not assume which side you are on: part-time, fixed-term, seasonal and agency staff all need checking against the regulations' definition of a worker, and we do that with the lawyer in the readiness check.
- With a collective agreement: the terms of an agreement in force when the regulations began are treated as compliant while that agreement runs on its own terms (Reg. 23(6)). The information and reporting duties still apply, and your lawyer should confirm how it applies to your agreement. We evaluate the jobs with the union on the panel and show where the agreed scales and the evaluation differ, so both sides reach the next negotiation with the same facts.
More on the pay transparency page.
Help with the cost
Sometimes, and we check before quoting. Digitalise your SME part-funds software and hardware you buy, but not consultancy fees. Malta Enterprise's Business Development scheme can support advisory work on digital transformation, at its discretion, and excludes gaming operators. Business Reports for SMEs pays a lump sum towards a process and systems review, but only through a registered service provider. Rules and deadlines change and the awarding body decides, so we never build a grant into our price.
We are not yet registered as a service provider under Business Reports for SMEs, so today that grant cannot be used for our work. We will say so on the first call if that changes.
What we will not pretend
got is a new firm and has not yet completed a project for a manufacturer. That is why the first step is small, fixed in price and measured: if the map does not find hours worth saving, you will see that in the figures, and you will have spent €3,400 to find out.
Sources: Legal Notice 173 of 2026; Davis (1989). Full references on the methods page.
Find out what the re-keying costs you.
Work and systems map: €3,400 fixed, excluding VAT, one process, three weeks. The first call is free, and we will come to you.